Rebar #6 Price: Typical Costs, Per-Foot Rates, and Regional Variations 2026
Buyers usually pay for #6 rebar based on length, weight, coating, and delivery. The exact cost depends on bar length, whether it’s plain or epoxy-coated, and how far it must be hauled to the job site. The price range shown here reflects common U.S. market conditions and standard project assumptions.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| Per-foot price (uncoated #6 rebar) | $0.60 | $0.95 | $1.50 | Assumes standard grade 60 steel, stock lengths |
| Per-foot price (epoxy-coated #6) | $1.20 | $1.60 | $2.20 | Corrosion protection adds cost |
| Per-ton price (approximate, mixed lengths) | $800 | $1,000 | $1,350 | Weight-based estimate for budgeting |
| Delivery charge (regional) | $40 | $120 | $300 | Distance and access impact |
Price Range for Rebar #6 by Length and Type
Typical total project costs vary by length requirements and coating. Short runs for small slabs tend to stay near the low end, while large slabs and epoxy-coated bars push toward the high end. Assumptions: standard ASTM A615 Grade 60 bars, normal access, inland metro region.
| Scenario | Low | Average | High | Notes |
|---|---|---|---|---|
| Residential slab reinforcement, #6 plain, 8 in. spacing | $250 | $420 | $680 | Includes cutting and tying labor |
| Residential footer or footing 12 ft length, epoxy-coated | $520 | $760 | $1,050 | Coating adds material and handling costs |
| Commercial slab, 20 ft length, #6 plain | $1,000 | $1,500 | $2,300 | Longer lengths, higher labor hours |
| Thin-wall reinforced wall, 6 ft run, epoxy-coated | $320 | $520 | $860 | Coating and routing impact |
Major Cost Components for Rebar #6 Projects
The quote breaks into four to six concrete parts, each with its own price range. A typical project considers materials, labor, delivery, and occasional permits or waste handling. Assumptions: standard residential or light commercial scope, normal site access.
| Component | Low | Average | High | Notes |
|---|---|---|---|---|
| Materials (plain #6 bar) | $0.60/ft | $0.95/ft | $1.50/ft | Based on length required |
| Labor (tying, cutting, arranging) | $2.50/ft | $3.50/ft | $5.50/ft | Includes supervision |
| Delivery/Haul | $40 | $120 | $300 | Distance-dependent |
| Coating (epoxy) | $0 | $0.60/ft | $0.70/ft | Optional upgrade |
| Waste/Dark material disposal | $0 | $0.10/ft | $0.40/ft | Light disposal scenarios |
| Permits/inspection | $0 | $50 | $300 | Depends on local rules |
Variables That Most Shape the Final Rebar #6 Quote
Project length and coating choice are two of the strongest cost drivers. Long runs dramatically multiply material and labor hours, while epoxy coating can add 20–40% to material costs. Other key drivers include access to the site, reuse of scrap, and local labor rates. Assumptions: standard structural use, crew of 2–3 workers, normal weather.
Regional Variation in Rebar #6 Pricing Across the U.S.
Prices differ by region due to supply, transport, and demand. Coastal markets and areas with steel tariffs or limited mills tend to run higher than inland markets. Expect a 5–15% spread between nearby metros for similar job scopes. Assumptions: metro vs rural delta, standard delivery window.
Concrete Reinforcement Options and How They Impact Cost
Choosing plain vs epoxy-coated alters the total spend. Epoxy-coated #6 adds material cost and may require specific handling, but improves durability in corrosive soils or coastal zones. Per-foot differences are most noticeable on large projects. Assumptions: standard concrete mix, no corrosion issues beyond coast exposure.
Labor Footprint: How Much Time Does #6 Reinforcement Typically Require
Labor hours scale with run length and mesh complexity. A simple rectangular slab may require 1–2 hours per 100 linear feet of rebar, while complex shapes with ties and supports can rise to 4–6 hours per 100 ft. Labor pricing often reflects crew size and regional wage standards. Assumptions: two-person crew, standard tying pattern.
Practical Ways to Reduce Rebar #6 Costs Without Compromising Structural Integrity
Control scope and materials to trim price. Compare plain vs epoxy-coated only where exposure necessitates protection, optimize layout to reduce waste, and time deliveries to avoid peak-rate surcharges. Bundling multiple tasks with the same supplier can lower delivery fees. Assumptions: two-week scheduling window, standard site prep complete.
Three Real-World Quote Scenarios for Rebar #6 Projects
- Small residential slab – 8 ft x 12 ft, plain #6, 8 in. spacing: Materials $90, Labor $260, Delivery $60; Total $410
- Residential footing – 12 ft x 12 ft, epoxy-coated, 12 in. depth: Materials $360, Labor $420, Delivery $110; Total $890
- Commercial floor reinforcement – 20 ft x 30 ft, plain #6, grid with 6 in. spacing, extended run: Materials $1,400, Labor $1,200, Delivery $180; Total $2,780
Cost-Tracking Table by Job Phase for Rebar #6
| Phase | Low | Average | High | Notes |
|---|---|---|---|---|
| Material purchase (ft or ton) | $0.60/ft | $0.95/ft | $1.50/ft | Assumes plain rebar |
| Labor to cut/fit | $2.50/ft | $3.50/ft | $5.50/ft | Includes tying |
| Delivery | $40 | $120 | $300 | Distance-based |
| Coating option | $0 | $0.60/ft | $0.70/ft | Epoxy adds cost |
| Permits/inspection | $0 | $50 | $300 | Local rules |