Gravel Cost Per Cubic Yard 2026
In the United States, gravel costs typically range from roughly $12 to $65 per cubic yard, depending on material type, delivery distance, and whether the gravel is screened or special-processed. The main cost drivers are material quality, quantity, and transportation. The following sections provide a practical pricing picture and budgeting guidance for common gravel projects.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| Gravel Material (delivered) | $12 | $28 | $65 | Includes basic crushed stone or rounded gravel; varies by region |
| Delivery Charge | $20 | $50 | $150 | Distance-based; longer hauls raise costs |
| Labor & Spreading | $0 | $8 | $20 | Self-spread vs. contractor; depends on area to cover |
| Taxes & Permits | $0 | $5 | $15 | Municipal taxes or disposal fees may apply |
| Total Project (Deliv. + Material) | $32 | $83 | $230 | Typical range for small to medium projects |
Overview Of Costs
Gravel costs combine material price and delivery, with additional charges for labor and disposal. The overview below shows total project ranges and per-unit estimates to help plan budgets. Assumptions: typical driveway or path use, average regional delivery radius, standard granite or limestone gravels, and no unusual site preparation.
Assumptions: region, specs, labor hours.
Cost Breakdown
| Category | Low | Average | High | Notes |
|---|---|---|---|---|
| Materials | $12 | $28 | $65 | Delivered price per cubic yard |
| Delivery/Haul | $20 | $50 | $150 | Depends on distance and load size |
| Labor | $0 | $8 | $20 | Spreading or grading by crew or DIY |
| Overhead & Equipment | $5 | $15 | $25 | Equipment use, fuel, and setup |
| Taxes/Permits | $0 | $5 | $15 | Sales taxes or local fees |
| Contingency | $0 | $5 | $15 | Buffer for site-specific issues |
What Drives Price
Material type and size drive the largest price swings. Crushed stone with angular faces generally costs more than river gravel. Delivery distance and load size add to haul costs, while surface prep like compaction or edging can shift requirements. A typical driveway project uses 1.5 to 4.0 cubic yards per 100 square feet, depending on depth and compaction needs.
Cost By Region
Regional differences can shift prices by roughly ±20–40% from national averages. In the Midwest and Plains, gravel tends to be cost-competitive, while coastal areas with higher labor and trucking costs see higher prices. Rural areas may face higher delivery charges due to fewer nearby suppliers, whereas urban markets offer more supplier options and potential price competition.
Labor, Hours & Rates
Self-installation can save labor costs but may increase time and effort. Typical installation hours scale with project size: small paths may take a half-day, while larger driveways can require a full day or more. When hiring, expect hourly rates for crew work in the $60–$120 range, plus delivery charges. For materials-only purchases, skip labor estimates and source a delivered quantity for a straightforward comparison.
Additional & Hidden Costs
Hidden costs can include site access fees, unload time, and staging space requirements. If the site is dry and accessible, delivery is smoother; wet or uneven terrain can require extra equipment or more rounds of spreading. Consider edging, weed barrier installation, and compaction, which may add to the total cost but improve durability and performance.
Ways To Save
Shop around for quotes and consider material options with similar performance. Compare prices from multiple suppliers within a reasonable delivery radius. Ordering slightly more material than needed can mitigate reordering costs, but avoid significant overage. DIY spreading reduces labor, though it may extend project time and impact finish quality.
Real-World Pricing Examples
Three scenario cards illustrate common gravel projects and their cost implications.
Basic Driveway (20 ft x 10 ft, 4 in depth)
Material: 8 cubic yards; Delivery: standard truck; Labor: DIY spreading
- Materials: $12–$28/yd³ → $96–$224
- Delivery: $20–$60
- Labor: $0 (DIY)
- Estimated Total: $120–$320
Mid-Range Parking Pad (24 ft x 12 ft, 5 in depth)
Material: 11 cubic yards; Delivery: extended haul; Labor: hired crew
- Materials: $28/yd³ average → $308
- Delivery: $40–$120
- Labor: $8–$20/yd³ → $88–$220
- Overhead/Taxes: $20–$40
- Estimated Total: $456–$708
Premium Stone Path (60 ft total, 3–4 in depth)
Material: premium crushed stone; Delivery: local; Labor: professional crew
- Materials: $40–$65/yd³ → $360–$585
- Delivery: $60–$150
- Labor: $60–$120/hr; 6–8 hours → $360–$960
- Taxes/Permits: $10–$25
- Estimated Total: $790–$1720