Everlast vs Hardie Siding Cost Comparison 2026
Buyers typically pay for siding based on material, installation, and regional labor rates. The main cost drivers are material type, house size, and removal or prep work. This article compares cost, price ranges, and what affects pricing for Everlast and Hardie fiber cement siding.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| Material (per sq ft) | $2.50 | $4.50 | $7.50 | Everlast composite vs Hardie fiber cement, excluding labor |
| Installed Cost (per sq ft) | $6.00 | $12.00 | $16.50 | Includes removal, prep, and finish; regional variance applies |
| Labor (per hour) | $35 | $60 | $90 | Skilled exterior carpentry and siding crew |
| Labor Time (hours per 1,000 sq ft) | 8–10 | 12–20 | 22–28 | Depends on complexity and height |
| Permits & Codes | $100 | $400 | $1,000 | Region-dependent |
| Delivery/Disposal | $0.50 | $2.00 | $4.00 | Packaging and haul-off costs |
Assumptions: region, house size, siding profile, and labor hours vary by project
Overview Of Costs
Everlast siding usually sits at a lower installed price per square foot than Hardie fiber cement in many markets, but the gap narrows with premium profiles or abundant removal work. Typical total project ranges span from about $6,000 to $30,000 for a standard 1,500–2,000 sq ft home, depending on product choice, trim, and complexity. Assumptions: region, specs, labor hours.
Cost Breakdown
For clarity, the following table summarizes the major cost buckets and their typical ranges.
| Materials | Labor | Equipment | Permits | Delivery/Disposal | Warranty | Overhead | Contingency |
|---|---|---|---|---|---|---|---|
| Everlast: $2.50–$4.50 / sq ft | $0.60–$4.00 / sq ft | $0.50–$1.50 / sq ft | $100–$400 | $0.50–$2.00 / sq ft | 5–50 years | $0.50–$1.50 / sq ft | 5–10% |
| Hardie: $3.50–$7.50 / sq ft | $0.70–$5.00 / sq ft | $0.60–$2.00 / sq ft | $150–$1,000 | $0.70–$2.50 / sq ft | 15–30 years | $0.60–$1.80 / sq ft | 5–12% |
Two niche drivers matter: (1) siding thickness or profile (Everlast vs Hardie transits in 6.5–9.5 mm vs 8–12 mm), (2) roof/wall abutting details that require trim and sealing. data-formula=”thickness × cost_multiplier”>
What Drives Price
Material performance and warranty depth are major factors, with fiber cement generally commanding higher upfront cost but longer life. Installation complexity, weather exposure, and existing substrate condition heavily influence overall pricing. Assumptions: region, specs, labor hours.
Labor, Hours & Rates
Labor rates vary by region and crew expertise; urban markets show higher hourly rates, while rural areas may save on labor but incur travel or scaffolding costs. Typical projects use 8–20 labor hours per 1,000 sq ft, depending on removal needs and wrap-around details. Assumptions: region, crew size, height.
Regional Price Differences
Prices differ notably across regions in the U.S. The table below summarizes three representative regions and the delta versus national averages. In the West, material costs tend to be higher; the Midwest often offers better value; the South may have moderate labor variations. Assumptions: project scope standard, replace or install only.
- West (Coast, Mountain): materials +10% to +20% vs national average
- Midwest: near national averages, occasional regional spikes
- South: labor often 5%–15% lower, materials variable by supplier
Local Market Variations
Urban vs Suburban vs Rural pricing shows distinct patterns. Urban markets incur higher labor rates and scaffold/setup costs, while Rural jobs may see lower labor but higher travel charges. Assumptions: single-story home, standard profile.
Real-World Pricing Examples
Three scenario cards illustrate typical outcomes for Everlast and Hardie siding projects. Each card lists specs, labor hours, per-unit prices, and totals to help budget decisions.
- Basic — Everlast, single-story, 1,200 sq ft, no intricate trim. Specs: 6.5 mm profile, standard channel, basic paint. Hours: 8–12. Materials: $3.00 / sq ft. Installed: $6.50 / sq ft. Total: $9,600–$17,400. Per-unit: $9.50 / sq ft.
- Mid-Range — Hardie, 1,600 sq ft, moderate trim, some removal. Hours: 12–18. Materials: $5.50 / sq ft. Installed: $11.50 / sq ft. Total: $17,600–$34,000. Per-unit: $13.50 / sq ft.
- Premium — Everlast or Hardie with roofline bays, multiple angles, high-end finish, permits. Hours: 20–28. Materials: $6.50 / sq ft. Installed: $14.50 / sq ft. Total: $28,000–$52,000. Per-unit: $17.00 / sq ft.
Assumptions: region, specs, labor hours.
Cost By Region
Regional snapshots help refine expectations for Everlast vs Hardie. In the Northeast, install costs trend higher due to weather-tightness work; the Southwest may see more favorable material pricing but higher desert climate considerations. Assumptions: 1,500–2,000 sq ft homes.
Price By Region
Three-region comparison with deltas: West: +10%–+20% on material and labor; Midwest: near baseline; South: -5% to +10% depending on market and supplier deals. Assumptions: standard installation, no major structural changes.
Extras & Hidden Costs
Hidden costs can affect final totals. Scaffold rental, disposal fees, temporary moisture protection, paint touch-ups, and trim stock can add $1,000–$3,000 in typical mid-size homes. Assumptions: standard exterior house wrap, minimal structural repair.
Maintenance & Ownership Costs
Longer-term costs favor Hardie for life-cycle value, with virtually no siding-related maintenance beyond occasional cleaning and resealing in select climates. Everlast may require more frequent repainting or panel replacement in some regions. Assumptions: 20-year horizon.
FAQs
Q: Which siding has a lower installed cost? A: Everlast often starts cheaper per square foot but total installed cost depends on project scale and trim. Q: Do both come with warranties?