The cost to remove cedar shake roof material varies widely by roof size, removal method, and disposal requirements. Typical drivers include tear-off labor, debris disposal, and subsequent replacement or repair needs. This article presents clear low–average–high ranges to help buyers estimate budgets and plan accordingly, with a focus on price and cost factors.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| Roof Size Assumption | 1,000 sq ft | 1,500 sq ft | 2,500 sq ft | Used for per-square calculations |
| Removal Cost (per sq ft) | $1.50 | $2.75 | $4.50 | Includes labor and debris handling |
| Total Tear-Off Cost | $1,500 | $4,125 | $11,250 | Based on stated roof sizes |
| Disposal / Dumpster Fees | $350 | $700 | $1,500 | Depends on debris volume and landfill fees |
| Permits & Inspections | $60 | $250 | $600 | Municipal requirements vary by region |
| Repairs to Deck/Sheathing (if needed) | $0 | $600 | $2,500 | Includes replacement sheathing or rot repair |
| Replacement Roofing (optional, after removal) | $3.50 | $6.50 | $9.50 | Per sq ft; not included in removal price |
| Subtotal | $5,210 | $16,125 | $36,450 | Estimates before regional adjustments |
| Taxes | $260 | $806 | $1,822 | Assumes 5%–6% |
| Contingency (10%) | $526 | $1,612 | $3,645 | Budget cushion for unknowns |
| Total Project Cost | $6,000 | $18,543 | $42,000 | Ranges vary by locale and scope |
Assumptions: region, roof size, tear-off method, disposal options, and whether replacement roofing is included.
Overview Of Costs
Typical cost ranges for cedar shake roof removal fall between $2.75 and $4.50 per square foot, with total project costs commonly spanning from roughly $6,000 to $42,000 depending on roof area and aftercare. Per-square-foot pricing covers labor, debris handling, and disposal, while larger roofs push total costs higher due to extended crew time and dumpster volume. If the roof shows substantial damage or requires deck repair, costs rise beyond tear-off estimates. For smaller homes, removal may sit near the lower end; for large or complex pitches, the high end applies.
Cost Breakdown
| Component | Low | Average | High | Notes |
|---|---|---|---|---|
| Materials | $0 | $0 | $0 | No material purchase for removal itself |
| Labor | $1,500 | $4,125 | $11,250 | Based on crew size and hours |
| Equipment | $200 | $450 | $1,000 | Includes skid steer or forklift if needed |
| Permits | $60 | $250 | $600 | Local permit requirements vary |
| Disposal | $350 | $700 | $1,500 | Dumpster + hauling costs |
| Delivery / Debris Removal | $200 | $520 | $1,200 | Labor for hauling away debris |
| Warranty / Overhead | $200 | $350 | $700 | Cost recovery by contractor |
| Taxes | $260 | $806 | $1,822 | Assumes typical tax rate |
| Contingency | $526 | $1,612 | $3,645 | 10% cushion |
What Drives Price
Primary drivers include roof size, pitch, and condition of underlying decking. Roof size dictates labor hours, while pitch affects safety equipment needs and time. If the sheathing is rotted or needs replacement, contractors price in materials and labor for deck repairs. Regional labor rates also influence outcomes, as do disposal costs and permit fees in urban markets. Cedar shake removal may require specialized crews, especially on steep or multi-story homes, pushing the price higher than standard tear-offs.
Ways To Save
Strategic timing and proper planning can trim costs by 10–20% in many markets. Consider scheduling removal in off-peak seasons when crews are less busy and permits are more affordable. If feasible, obtain multiple quotes and ask for a bundled price that includes disposal. Simplify by replacing with a lower-cost alternative roofing material only after assessment of deck integrity. For homes with manageable pitches, renting a dumpster for a shorter term can reduce per-day charges. Ensure the contractor confirms waste separation requirements to minimize disposal costs.
Regional Price Differences
Prices vary by region, with noticeable deltas among urban, suburban, and rural areas. Urban markets typically incur higher disposal and permit fees, while rural areas may have lower labor rates but longer travel times. Suburban regions often balance standard labor costs with moderate permit expenses. Expect roughly ±15% to ±30% variations between regions for tear-off projects of similar size and complexity.
Labor, Hours & Rates
Labor costs form the largest share of removal budgets. Most crews bill by the hour or per square foot, with typical hourly rates ranging from $40 to $90. A 1,500 sq ft roof could require 2–4 days of work for a small crew, depending on weather and roof pitch. SEER-rated staging or fall protection equipment may add to base labor in complex builds.
Real-World Pricing Examples
Assumptions: 1,500 sq ft roof, cedar shake, two-story, average pitch, urban market.
Basic scenario: Tear-off only, no deck repairs, standard disposal. Hours: 16–24; Crew: 2–3; Total: $7,000–$9,000.
Mid-Range scenario: Tear-off plus minor deck repairs, dumpster included. Hours: 24–40; Crew: 3–4; Total: $12,000–$18,000.
Premium scenario: Tear-off, extensive deck repair, new underlayment, disposal, and permits. Hours: 40–60; Crew: 4–5; Total: $22,000–$32,000.