Brick Versus Hardie Board Cost Comparison 2026
Homeowners typically see a notable difference in cost between brick and Hardie board siding, driven by material prices, installation complexity, and long-term upkeep. Budget planning should weigh initial hard costs against lifetime value, including maintenance and potential energy savings. The following overview presents cost ranges in USD and highlights key pricing drivers for a clear comparison of brick vs Hardie board.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| Material (Bricks, Hardie board siding) | $2.50 – $6.00 / sq ft | $6.00 – $11.50 / sq ft | $11.50 – $18.00 / sq ft | Bricks kosten higher per sq ft; Hardie board is engineered concrete panel |
| Labor & Installation | $8.00 – $12.00 / sq ft | $12.00 – $22.00 / sq ft | $22.00 – $35.00 / sq ft | Brick requires skilled masons; Hardie board faster to install |
| Permits & Inspections | $150 – $600 | $300 – $1,200 | $1,200 – $2,500 | Regional rules vary; heavier brick may trigger additional bracing |
| Delivery/Disposal | $50 – $250 | $150 – $500 | $500 – $1,000 | |
| Warranty & Longevity | 1–5 years | 10–50 years | Lifetime or long-term (with maintenance) | Hardie typically longer warranty; brick depends on mortar & mortar joints |
Overview Of Costs
Cost ranges reflect total project pricing with common site assumptions. The brick vs Hardie board decision hinges on material expense, labor intensity, and regional market rates. Brick typically means higher upfront material and skilled labor costs, while Hardie board offers a lower install barrier and favorable long-term maintenance. The table below shows total project ranges and per-unit guidance with brief assumptions.
Cost Breakdown
Breakdown highlights where money goes in each path. The following table sums primary cost drivers and shows how totals compose from materials, labor, and ancillary charges. Assumptions: 1,500 sq ft homeSF; standard 8–12 ft walls; typical window/door penetrations; climate-neutral installation window.
| Category | Brick (Low) | Brick (Average) | Hardie Board (Low) | Hardie Board (Average) |
|---|---|---|---|---|
| Materials | $3,750 | $8,250 | $3,000 | $7,000 |
| Labor | $12,000 | $18,000 | $7,500 | $12,000 |
| Permits | $300 | $900 | $300 | $800 |
| Delivery/Disposal | $150 | $300 | $100 | $350 |
| Warranty/Contingency | $350 | $600 | $400 | $700 |
Assumptions: region, specs, labor hours.
Factors That Affect Price
Material type and installation complexity drive price variance. Key drivers include brick’s material hardness, bond pattern, and wall height, versus Hardie board’s panel system, fastener needs, and trim options. The following numeric thresholds help predict costs: brick walls above 8 ft with intricate arches can add 15–25% in labor; Hardie board installations in coastal zones may incur 5–12% extra for corrosion-resistant fasteners and sealants.
Ways To Save
Smart budgeting can trim upfront costs without compromising performance. Consider mid-range brick alternatives (drainage-safe mortars, standard bond), or opt for Hardie board with factory priming and limited-scope color finishes. Bulk order discounts, local labor rates, and phased installation help manage cash flow. Below are practical approaches that avoid common overages.
Regional Price Differences
Prices vary by market. In the Northeast urban centers, brick projects often run 15–25% higher than national averages due to labor scarcity and higher material costs. In the Midwest suburban zones, Hardie board tends to be 5–12% below coastal pricing, driven by lower freight and quicker installs. Rural Western markets can show wide swings based on crew availability, with brick sometimes 10–18% cheaper per sq ft when supply chains align.
Labor & Installation Time
Time and crew size affect total cost. Brick installations generally require 2–3 masonry specialists and slower progression, adding 1.2–1.8x more labor hours than Hardie board on a square-foot basis. Typical crew sizes include 2–4 people for Hardie board siding and 3–6 masons for brick, depending on wall complexity and scaffold access. A short labor-hours estimate: brick 60–90 hours for 1,500 sq ft; Hardie board 35–60 hours.
Additional & Hidden Costs
Hidden items can shift the budget by a meaningful margin. Roofing edge flashing, moisture barriers, corner trims, and insulation adjustments may be needed for brick or Hardie board. Optional upgrades like decorative brick patterns or higher-grade Hardie trims add 5–12% to the project. Unexpected subsurface repairs or drainage fixes can add 2–6%.
Real-World Pricing Examples
Three scenario snapshots illustrate typical budgets. These cards reflect common configurations and show how totals are built from different combos of materials and labor.
-
Basic Brick Accent — 1,500 sq ft home, standard brick, simple bond, minimal decorative work.
Assumptions: region, specs, labor hours.- Materials: $3,000
- Labor: $12,000
- Permits/Fees: $300
- Delivery/Disposal: $150
- Total: $15,450
- Per sq ft: $10.30
-
Mid-Range Brick with Detail — 1,800 sq ft, brick with decorative bond, enhanced mortar, added flashing.
Assumptions: region, specs, labor hours.- Materials: $6,000
- Labor: $18,000
- Permits/Fees: $700
- Delivery/Disposal: $250
- Total: $25,250
- Per sq ft: $14.03
-
Mid-Range Hardie Board Upgrade — 1,800 sq ft, premium finishes, moisture barrier, trim package.
Assumptions: region, specs, labor hours.- Materials: $7,000
- Labor: $12,000
- Permits/Fees: $600
- Delivery/Disposal: $350
- Total: $19,950
- Per sq ft: $11.08
Cost By Region
Regional pricing deltas influence absolute costs. In urban coastal areas, brick projects may exceed typical ranges by 15–25%, while Hardie board projects might stay within 5–12% of national averages. Suburban zones often sit near the average, with small +/- adjustments; rural areas can deviate due to freight and crew availability. Regions with higher labor costs tend to widen the gap between brick and Hardie board.