Cost to Replace Siding With Brick 2026
Homeowners typically see a wide range for brick siding replacement, driven by veneer versus full brick and by project scope. The cost factors include material type, wall area, removal of old siding, and labor intensity. The following figures use USD and reflect typical market pricing in the United States.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| Brick Veneer Installed | 9 | 17 | 28 | Per sq ft, veneer over a wood or steel frame |
| Full Brick Installed | 18 | 32 | 60 | Per sq ft, actual brick face only; structural concerns may add |
| Average Home Exterior (1,800–2,400 sq ft) | 16,200 | 30,000 | 70,000 | Includes removal of existing siding and basic prep |
| Removal of Existing Siding | 1,000 | 3,500 | 7,000 | Labor and disposal |
| Permits & Inspections | 100 | 800 | 2,000 | Region dependent |
Overview Of Costs
Typical ranges guide most budgets for brick siding conversion with a distinction between brick veneer and full brick. Veneer projects commonly fall in the mid range, while full brick pushes toward the higher end due to heavier materials and structural requirements. Assumptions include standard single story or two story homes with mid range brick products.
Cost Breakdown
The following table shows the main cost categories and the typical ranges for a mid sized home. The total may differ based on wall height, complexity of details, and regional labor rates.
| Category | Low | Average | High | Notes |
|---|---|---|---|---|
| Materials | 8,000 | 14,000 | 40,000 | Brick type, veneer vs full brick; jointing style varies |
| Labor | 6,000 | 12,000 | 30,000 | Crew size and duration depend on scope |
| Equipment | 1,000 | 3,000 | 8,000 | Scaffolding and lifts may be rented |
| Permits | 100 | 750 | 2,000 | Local requirements vary |
| Removal & Disposal | 1,500 | 3,500 | 7,500 | Old siding and debris |
| Delivery & Extras | 200 | 1,000 | 3,000 | Brick orders, mortar, flashing |
What Drives Price
Brick type and wall scope are primary drivers. Full brick costs more per sq ft than veneer and may require structural adjustments. Project size and wall geometry impact labor hours and scaffold needs. A 2,000 sq ft facade with standard veneer typically costs less than a 2,500 sq ft home with full brick and complex corners.
Ways To Save
Costs can be reduced by choosing veneer brick over full brick, simplifying window and door openings, and planning for off season scheduling. Bulk material orders and in house coordination can trim delivery and handling charges.
Regional Price Differences
Prices vary by region due to labor markets and material availability. In the Northeast, expect higher labor rates; the Midwest often shows mid range; the South may run lower on installation costs. Regional deltas typically range ±15 to 25 percent from the national average depending on local conditions.
Labor & Installation Time
Labor hours scale with wall area and brick type. Veneer projects may require 2–5 days for a typical 1,800 sq ft home, while full brick can extend to 2–4 weeks in complex homes. Estimate crew size and site access in advance.
Additional & Hidden Costs
Hidden costs include weather delays, moisture barriers, and the need for structural reinforcement if the shear transfer changes. Ventilation, flashing, and sealant joints add to the bottom line and should be planned for upfront.
Real World Pricing Examples
Three scenario cards illustrate common outcomes for brick siding replacement.
Basic — Veneer on a 1,800 sq ft single story home; minimal detailing; removal only of existing vinyl siding; approximate total 14,000 to 22,000 with per sq ft around 7–12 for veneer finished products.
Mid Range — Veneer with standard brick and modest detailing on a 2,000 sq ft two story; total around 26,000 to 42,000; per sq ft 13–21; assumes standard windows and simple corners.
Premium — Full brick on a 2,400 sq ft two story with custom joints and enhanced flashing; totals commonly 60,000 to 100,000; per sq ft 25–40; includes structural prep and higher grade brick.
Assumptions: region, specs, labor hours
Note on pricing logic: labor hours times hourly rate is a common method to estimate project cost. Labor hours × hourly rate